Skip to main content
Optical networking products and project support worldwide
sales@astraphoton.comInternational sales support
Astra PhotonGlobal optical networking

Network application

Data centre interconnect and metro links

Plan longer-reach connections around the installed fibre, optical budget and wavelength path.

Define the project before selecting the optics.

Inter-site links need a record of the complete optical path. Include fibre spans, patch panels, passive equipment and both endpoint interfaces. Compare the current service with the target capacity before selecting a wavelength-specific or coherent model.

Request a technical review
Data centre interconnect and metro links

Decisions that shape the shortlist

Optical path and budget

Record the measured span length, fibre type, connector path and available loss measurements. Include mux/demux equipment and other passive components when reviewing the link budget.

Wavelength and interface

Provide the CWDM or DWDM plan, channel requirements and host interfaces. Confirm the exact coherent form factor and line-side requirements with the target platform.

Migration and restoration

Document retained links, upgrade windows and replacement units. Agree the paired endpoints and evaluation scope before deploying a new rate or wavelength.

Product families to review

Select the exact model after checking the host, cable path and operating requirements.

From evaluation to rollout

  1. Record both endpoints and the complete passive path.
  2. Review measured loss against the selected model specification.
  3. Confirm channel, connector and coding requirements.
  4. Evaluate the planned configuration before service migration.

Prepare your project brief

Send the span schedule, fibre and loss measurements, wavelength plan, passive equipment, endpoint models and migration dates.

ISP, metro and FTTH aggregation

A POP expansion or access aggregation project may include different rates and optical paths in the same network. Document each span separately, including passive equipment, patching and the remote endpoint. This makes it possible to review the required optical budget and wavelength pairing without treating all links as interchangeable.

Topology and fibre allocation

List the access, aggregation and uplink interfaces. Record whether each span uses a fibre pair or a single fibre, and identify the equipment at the remote end.

Wavelength and passive path

Provide the CWDM or DWDM channel plan and any mux/demux equipment in the path. For BiDi candidates, record the required transmit/receive pairing at both ends.

Reach and maintenance

Provide span length and available loss measurements, including patching and passive components. Identify the sites requiring temperature review and the replacement stock needed by field teams.

Send the network topology, endpoint models, span lengths, fibre allocation, wavelength plan, passive equipment list and site temperature requirements.

Explore other applications